首页> 外文期刊>Railway Track and Structures >PREPARING FOR WINTER'S RETURN
【24h】

PREPARING FOR WINTER'S RETURN

机译:为冬天的回归做准备

获取原文
获取原文并翻译 | 示例
           

摘要

The winter of 2014-2015 could be labeled as chaotic at best for the Massachusetts Bay Transportation Authority (MBTA). A quick succession of major storms slammed the Boston area, leaving more than 110 inches of snow. February 2015 was the snowiest month in recorded history for Boston and also the month commuter trains remained on schedule only about a third of the time. A customer confidence crisis ensued, which required quick action and long-term planning to combat.
机译:对于马萨诸塞州海湾运输局(MBTA)来说,2014-2015年冬季充其量可以说是混乱的季节。一连串的大风暴猛烈袭击了波士顿地区,留下了超过110英寸的积雪。 2015年2月是有史以来波士顿有史以来最下雪的月份,而通勤列车也仅按时排在三分之一左右。随后发生了客户信心危机,这需要采取迅速行动并制定长期计划来进行应对。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号