...
首页> 外文期刊>Railway Gazette International >Changchun adds light rail line
【24h】

Changchun adds light rail line

机译:长春增加轻轨线

获取原文
获取原文并翻译 | 示例
           

摘要

The third line of Changchun's light rail network opened on October 30. Line 8 runs north from the northern terminus of metro Line 1 at North Ring Road to Guangtonglu.CRRC Changchun has supplied a fleet of six-section Type C light rail vehicles to operate the elevated 13.3 km route with 12 stops; these are stabled at a depot at Taiping near the northern end of the line. They have capacity for 622 passengers, including 124 on seats which are heated to provide greater comfort in the city's cold winters. The LRVs draw power at 750 V DC and have a maximum operating speed of 70 km/h.
机译:长春轻轨网络的第三条线于10月30日开通。8号线从地铁1号线北环路北端向北延伸至广通路。中国中车长春提供了六节C型轻轨车辆车队。高架路线13.3公里,停12个站;这些被稳定在生产线北端附近太平的一个仓库中。它们可容纳622位乘客,其中包括124位可加热的座椅,以在城市寒冷的冬天提供更大的舒适度。 LRV在750 V DC时汲取功率,最大运行速度为70 km / h。

著录项

  • 来源
    《Railway Gazette International》 |2018年第12期|12-12|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号