...
首页> 外文期刊>Rail >Problems looming on TfL Rail 'local' trains to Reading
【24h】

Problems looming on TfL Rail 'local' trains to Reading

机译:TfL铁路“本地”火车到雷丁的迫在眉睫的问题

获取原文
获取原文并翻译 | 示例
           

摘要

AS reported in RAIL 889, TfL Rail will be taking over 'local' trains between Paddington and Reading from the start of the next timetable on December 15. Great Western Railway (GWR) will still run the occasional peak fast service to Slough, Maidenhead and Twyford, and will continue operating the Greenford, Windsor & Eton Central, Marlow and Henley-on-Thames branches as shuttles. Just to clarify: when RAIL said that Acton Main Line, West Ealing and Hanwell will not be served by TfL Rail, it is the new Reading services that won't call at those three stations -indeed, TfL Rail is currently the only operator to do so, with stops in its existing Hayes & Harlington/Heathrow trains which will (of course) continue.
机译:根据RAIL 889中的报道,TfL铁路将从12月15日的下一个时刻表开始接替帕丁顿和雷丁之间的“当地”火车。GreatWestern Railway(GWR)仍然偶尔会开往Slough,Maidenhead和Twyford,并将继续以班车的形式运营Greenford,Windsor和Eton Central,Marlow和Henley-on-Thames分支机构。只是要澄清一下:当RAIL表示TfL Rail不会为Acton Main Line,West Ealing和Hanwell提供服务时,这是新的Reading服务,不会在这三个车站呼叫-实际上,TfL Rail是目前唯一的运营商为此,停止现有的Hayes&Harlington / Heathrow火车,这将继续(当然)。

著录项

  • 来源
    《Rail》 |2019年第890期|66-67|共2页
  • 作者

    Barry Doe;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号