...
首页> 外文期刊>Rail professional >Work begins to link South Wales Metro Control Centre to the rail network
【24h】

Work begins to link South Wales Metro Control Centre to the rail network

机译:工作开始将南威尔士州地铁控制中心链接到铁路网络

获取原文
获取原文并翻译 | 示例
           

摘要

Work to link the South Wales Metro Control Centre to the rail network has begun, ready for the arrival of the new £150-million fleet of Metro tram-trains. The scheme includes raising the road bridge and creating a new tunnel to join the £100 million control centre, maintenance facility and depot in Taff's Well, Cardiff, to the rail network. Phase 1 will involve work to prepare the site for the new tunnel between 23 August and 10 December 2021. Pending planning approval, Phase 2 will involve the build of the new bridge between 10 December 2021 and Autumn 2022.There will also be work to install deep drainage to the area whilst the modification of Taff's Well station car park is taking place.
机译:将南威尔士州地铁控制中心联系起来的铁路网络已经开始,准备到达新的150万英镑的地铁电车列车。 该方案包括培养道路桥梁,并创建一个新的隧道,加入Taff的Taff井中的1亿英镑的控制中心,维修设施和仓库,进入铁域。 第1阶段将涉及工作,为2010年12月23日和10日至10月10日之间为新隧道准备该网站。待定规划批准,阶段将涉及2021年12月10日和2022年秋季的新桥梁的构建。还有工作要安装 在塔夫的井站停车场修改时,深入排水。

著录项

  • 来源
    《Rail professional》 |2021年第275期|10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号