首页> 外文期刊>Rail International >Stress calculations for direct fastening track
【24h】

Stress calculations for direct fastening track

机译:直接紧固轨道的应力计算

获取原文
获取原文并翻译 | 示例
           

摘要

The High-Speed Line Zuid (HSL-Zuid) is the Dutch link to the European high-speed network. The HSL-Zuid will connect Amsterdam and Rotterdam with the capitals of Belgium and France. Due to bad subsoil conditions in the Netherlands the HSL-Zuid is to be built as a continuous viaduct. To maximise the advantage of this continuous viaduct, it was decided that the line would be built as ballastless track with a construction depth of only 36 cm. To clear the way for the design and construction contract for the tracks, overhead line, signalling and telecommunications, Project-organisatie HSL-Zuid started a project to develop ballastless track.
机译:高速线路Zuid(HSL-Zuid)是荷兰与欧洲高速网络的链接。 HSL-Zuid将连接阿姆斯特丹和鹿特丹以及比利时和法国的首都。由于荷兰的地基条件恶劣,HSL-Zuid将作为连续高架桥建造。为了最大程度地利用此连续高架桥的优势,决定将这条线建造为无ball轨道,施工深度仅为36厘米。为了为轨道,架空线,信号和电信的设计和施工合同扫清道路,HSL-Zuid项目组织组织了一个开发无ball轨道的项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号