首页> 外文期刊>Rail business intelligence >For 'system' Read 'menu'
【24h】

For 'system' Read 'menu'

机译:对于“系统”,请阅读“菜单”

获取原文
获取原文并翻译 | 示例
           

摘要

While the speakers from Network Rail at the 1RSE conference on March 17 left the audience baffled when asked to explain the concepts which will underpin the development of NP's modular signalling strategy (p6), subsequent discussions at least provided some insight. Signalling engineers were confused by the use of the word 'modular' since modern electronic signalling is made up of standard modules.rnFortunately, one eminent sig-rnnalling engineer picked up a reference to geographical signalling and realised that the aim is to have a 'menu' of signalled track configurations which could be put together to make a complete line of route. This was subsequently confirmed.
机译:尽管在3月17日举行的1RSE会议上来自Network Rail的发言人让观众感到困惑,但当他们被要求解释将支持NP模块化信号策略(p6)发展的概念时,随后的讨论至少提供了一些见识。信号工程师对“模块化”一词的使用感到困惑,因为现代电子信号由标准模块组成。幸运的是,一位著名的信号工程师选择了地理信号参考,并意识到其目的是要有一个“菜单”。可以组合在一起以构成完整路线的信号轨道配置。随后证实了这一点。

著录项

  • 来源
    《Rail business intelligence》 |2009年第339期|7-7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号