首页> 外文期刊>Rail Business Intelligence >High Speed 2 Heads For Scotland
【24h】

High Speed 2 Heads For Scotland

机译:苏格兰高速2头

获取原文
获取原文并翻译 | 示例
           

摘要

Transport Minister Lord Adonis has formally responded to a letter from High Speed 2 Chairman Sir David Rowlands dated February 13 setting out his 'initial views on the objectives and remit' established for the development company by the Department for Transport (below). In his reply of March 9, Adonis set out the specific objectives to be met by a report from HS2 which the Secretary of State expects to receive by 'the end of the year'. Firstly, there should be 'a route proposal - with any necessary options - from London to the West Midlands with appropriate environmental, social and economic assessments'. This should be 'sufficiently developed to form the basis for a soundly-based public consultation', should the government decide to proceed with building the new high-speed line. Secondly, HS2 should 'provide advice on the potential development of a high-speed line beyond the West Midlands, at the level of broad corridors'. This would 'consider in particular the potential for HS2 to extend to the conurbations of Greater Manchester, West Yorkshire, the North East and Scotland'.
机译:交通部长阿多尼斯勋爵(Lord Adonis)正式回应了高速2主席戴维·罗兰兹爵士(Sir David Rowlands)2月13日的一封信,信中阐述了他对运输部为开发公司建立的“目标和职权的初步看法”(如下)。国务卿预计,HS2的报告将在3月9日的答复中提出具体目标,国务卿希望该报告能在“年底”之前收到。首先,应该有“从伦敦到西米德兰兹郡的路线建议,包括任何必要的选择,并进行适当的环境,社会和经济评估”。如果政府决定着手建设新的高速铁路,则应“充分开发以形成良好基础的公众咨询的基础”。其次,HS2应该“就宽阔走廊水平的西米德兰兹地区以外的高速铁路的潜在发展提供建议”。这将“特别考虑HS2扩展到大曼彻斯特,西约克郡,东北和苏格兰的城市的潜力”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号