【24h】

Ell Phase 2 Funded

机译:Ell第二阶段资助

获取原文
获取原文并翻译 | 示例
           

摘要

'I am pleased to announce an additional £64m for TfL which will allow them to press ahead with the further extension of the East London Line to Clapham Junction and deliver a number of other transport improvements in London', said Secretary of State for Transport Geoff Hoon on February 12.rnPhase 2 of the East London Line extension programme is expected to cost a total of £75m, of which TfL is providing £15m. London Overground is due to start running four trains/h over the South London Line to Clapham Junction in May 2012, taking over the operation of this route and of Wands-worth Road and Clapham High Street stations from Southern.
机译:运输事务大臣杰夫说:“我很高兴宣布为TfL增拨6400万英镑,这将使他们能够进一步推进东伦敦线至克拉珀姆交界处的扩建,并在伦敦进行其他一些运输方面的改进”霍恩(Hoon)于2月12日进站。东伦敦线扩建计划第二阶段预计将耗资7500万英镑,其中TfL将提供1500万英镑。伦敦上空区(London Overground)将于2012年5月开始以每小时四班的速度穿越伦敦南线,到达克拉珀姆枢纽(Clapham Junction),接管这条路线以及南部的旺兹沃斯路(Wands-worth Road)和克拉珀姆大街(Clapham High Street)车站的运营。

著录项

  • 来源
    《Rail business intelligence》 |2009年第336期|4|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号