首页> 外文期刊>Rail business intelligence >Northwest Triangle trimmed?
【24h】

Northwest Triangle trimmed?

机译:西北三角形修整了吗?

获取原文
获取原文并翻译 | 示例
           

摘要

In his speech on October 20, the Chancellor George Osborne singled out 'rail electrification between Manchester, Liverpool, Preston and Blackpool' for special mention among projects that would go ahead, despite the reduction in funding available to DfT. However, RBI understands that the complex route from Manchester to Preston via Chorley may fall behind the other two sides of the triangle, connecting Liverpool to Manchester and the WCML at Wigan.rnNo other electrification projects were mentioned, but a statement on the Great Western Main Line is expected by the end of the first week in November. Found to have the best business case of all by Network Rail, the Midland Main Line scheme is now being developed to GRIP Stage 2 as a matter of urgency.
机译:财政大臣乔治·奥斯本(George Osborne)在10月20日的演讲中,特别提到了“曼彻斯特,利物浦,普雷斯顿和黑潭之间的铁路电气化”,尽管DfT可用的资金有所减少,但这些项目仍将继续进行。然而,印度储备银行了解到,从曼彻斯特到乔斯顿的普雷斯顿的复杂路线可能落在该三角形的另外两个边上,从而将利物浦与曼彻斯特以及威根的WCML连接起来。未提及其他电气化项目,只是在大西部地区的声明预计在11月的第一个星期结束时排线。通过Network Rail发现,Midland Main Line方案是所有业务中最好的,目前正紧急地将其开发到GRIP第二阶段。

著录项

  • 来源
    《Rail business intelligence》 |2010年第377期|p.8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号