【24h】

Resignalling progress

机译:令人失望的进度

获取原文
获取原文并翻译 | 示例
           

摘要

Control of signalling on the Birmingham Snow Hill - Stratford-upon-Avon route is due to transfer to the West Midlands Signalling Control Centre in Saltley on November 1, following a series of blockades this week. Buses replace trains between Shirley and Stratford from October 25 to 29, and between Snow Hill and Stratford on October 30 to 31. The resignalling programme has involved the closure and demolition of three manual signalboxes at ShiTley, Henley and Bearley. The junction at BeaTley is also being redesigned and the track layouts at Henley-in-Arden and Shirley are being improved.
机译:继本周发生一系列封锁之后,将于11月1日将伯明翰雪山-埃文河畔斯特拉特福航线上的信号控制权转移到萨特利的西米德兰兹信号控制中心。 10月25日至29日之间,有公共汽车代替了雪莉和斯特拉特福德之间的火车,10月30日至31日,还有雪山和斯特拉特福德之间的火车。撤离计划涉及关闭和拆除ShiTley,Henley和Bearley的三个手动信号箱。 BeaTley的交叉路口也正在重新设计,Henley-in-Arden和Shirley的赛道布局也得到了改善。

著录项

  • 来源
    《Rail business intelligence》 |2010年第377期|p.2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号