首页> 外文期刊>Rail business intelligence >NR called in over Cambrian EDS
【24h】

NR called in over Cambrian EDS

机译:NR致电寒武纪EDS

获取原文
获取原文并翻译 | 示例
           

摘要

Safety issues raised during trials for the ETCS Early Deployment Scheme on the Cambrian Lines will be discussed when Network Rail attends a meeting with ORR this week to determine how this stalled project can be moved forward.rnAs reported in RB1366 (p7), the outstanding problem is with the location and visibility of the Driver-Machine Interface, an illuminated screen displaying current and target speeds, as well as when to slow down. There have also been some instances of onboard equipment failing to communicate properly with balises on the track which primarily confirm train location, but RBI has been assured that detection and rectification of a fault has eliminated this problem.
机译:当Network Rail参加本周与ORR举行的会议以决定如何继续推进停滞的项目时,将讨论在寒武线上ETCS早期部署计划的试验过程中提出的安全问题。如RB1366(p7)所述,悬而未决的问题与人机界面的位置和可见性有关,有一个显示当前和目标速度以及何时减速的发光屏幕。也有一些车载设备无法与轨道上的栏杆正确通信的情况,这些情况主要可以确定火车的位置,但是印度储备银行已确保通过检测和纠正故障消除了这一问题。

著录项

  • 来源
    《Rail business intelligence》 |2010年第367期|P.1|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号