【24h】

SWT extends ITSO trial

机译:SWT延长了ITSO试验

获取原文
获取原文并翻译 | 示例
           

摘要

Following over a year of experience from an ITSO smartcard pilot scheme on the Staines - Windsor & Eton Riverside branch, SWT is implementing the ticketing system on its main lines. The pilot began on November 2008, with a small number of season ticket holders able to use smartcards at five stations on the branch.rnRoll-out of the extended trial has been in two stages, starting with stations between Staines and Wokingham. This was followed last week by stations between Basingstoke and Weymouth, including the Lymington Pier branch and the Isle of Wight.
机译:SWT在Staines-Windsor和Eton Riverside分支机构的ITSO智能卡试点计划中拥有超过一年的经验,SWT正在其主线上实施票务系统。试点于2008年11月开始,少数季票持有人可以在分支机构的五个站点使用智能卡。rn扩展试验的实施分两个阶段进行,从斯坦斯和沃金厄姆之间的站点开始。上周紧接着是贝辛斯托克和韦茅斯之间的车站,包括利明顿码头分行和怀特岛。

著录项

  • 来源
    《Rail business intelligence》 |2010年第367期|P.7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号