【24h】

Water Eaton hub

机译:伊顿水上枢纽

获取原文
获取原文并翻译 | 示例
           

摘要

Chiltern Railways aims to provide a half-hourly service between London Marylebone and Oxford with a 66 min journey time when its Evergreen 3 project is completed. This will be only 5 min slower than the fastest First Great Western timing from Paddington. However, Chiltern believes that one key to the success of Evergreen 3 will be Water Eaton Parkway which will be 58 min from London. With its excellent bus connections and large car park, the new station is expected to attract travellers from the eastern side of Oxford who would otherwise have to travel into the city centre.
机译:Chiltern Railways的目的是在Evergreen 3项目完成后,在伦敦马里波恩和牛津之间提供半小时的服务,行程时间为66分钟。这将比距Paddington最快的First Great Western时间慢5分钟。然而,奇尔滕认为,常绿3号成功的关键之一将是距伦敦58分钟路程的Water Eaton Parkway。凭借其良好的公交连接和大型停车场,新车站有望吸引来自牛津东部的旅行者,否则他们将不得不前往市中心。

著录项

  • 来源
    《Rail business intelligence》 |2010年第358期|4|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号