【24h】

Crossrail moves ahead

机译:横梁前进

获取原文
获取原文并翻译 | 示例
           

摘要

Transferred to llford depot at the end of last year, the first of the 66 Class 345 Aventra EMUs being built by Bombardier was due to begin test running on the Great Eastern Main Line on the night of January 7. Running in a reduced seven-car formation due to restricted platform lengths at London Liverpool Street, the first Class 345s are due to start revenue operation on TfL Rail services between Liverpool Street and Shenfield from May. Addressing the Railway Study Association on January 3, MTR Crossrail Programme Director Nigel Holness explained that the units would initially be maintained by Bombardier at llford pending completion of the Crossrail depot at Old Oak Common.
机译:去年年底,庞巴迪公司建造的66辆345级Aventra动车组中的第一批转移到了llford仓库,计划于1月7日晚上在大东方干线上开始测试。由于伦敦利物浦街的平台长度受限制而形成,第一批345级客机将从5月开始在利物浦街和申菲尔德之间的TfL铁路服务上运营收益。 MTR Crossrail计划主管Nigel Holness在1月3日对铁路研究协会的讲话中解释说,这些单位最初将由庞巴迪在llford进行维护,直到Old Oak Common的Crossrail仓库完工为止。

著录项

  • 来源
    《Rail Business Intelligence》 |2017年第525期|3-3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号