When calculating the lot, should I pull the samples before or after my calculations? Are the samples Included in the produced quantity? For example, if a customer orders 10,000 bottles and the level-two inspection pulls 200 bottles, this drops the total shipped to the customer to 9,800. If 10,200 bottles are produced, the inspection level Increases to 315 bottles that must be pulled for testing. what is the correct sample size and production number?