...
【24h】

'Special' delivery

机译:“特殊”交货

获取原文
获取原文并翻译 | 示例
           

摘要

As weak traffic demand continues to reduce revenue, railroads keep trimming their capital budgets and slimming their workforces. With fewer dollars and people committed to infrastructure maintenance this year, railroads have shifted their focus from capacity expansion to ongoing track maintenance.rnSo - now more than ever - they're demanding premium track components that last longer, require less routine maintenance, accommodate heavier axle loads, reduce lifecycle costs and are easy to install. In addition, railroads are seeking standard product designs and component interchangeability.
机译:由于交通需求疲软继续减少收入,铁路部门不断削减其资本预算并削减其劳动力。由于今年用于基础设施维护的资金减少且人员投入减少,铁路已经将其重点从容量扩展转移到了正在进行的轨道维护。rn-如今,它们比以往任何时候都需要优质的轨道组件,这些组件的使用寿命更长,需要的日常维护更少,负担更重轴负载,降低生命周期成本,并且易于安装。另外,铁路正在寻求标准的产品设计和组件互换性。

著录项

  • 来源
    《Progressive Railroading》 |2009年第6期|485052-53|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号