...
首页> 外文期刊>Progressive Railroading >CN, Tundra Energy to build oil loading facility
【24h】

CN, Tundra Energy to build oil loading facility

机译:CN,Tundra Energy建造石油装载设施

获取原文
获取原文并翻译 | 示例
           

摘要

Last month, CN signed a memorandum of understanding with Tundra Energy Marketing Ltd. to construct a crude oil rail-car loading terminal near Cramer, Manitoba, to meet the needs of Bakken Shale crude-oil producers in Manitoba and Saskatchewan. The terminal will be designed to initially rail load 30,000 barrels of crude oil per day, beginning in second-quarter 2013, and accommodate a 100-car unit train, CN officials said in a prepared statement. The new terminal will help provide Tundra Energy access to alternative North American markets for Williston Basin crude oil "at a time when there is inadequate pipeline takeaway capacity," said Tundra Energy President Bryan Lankester.
机译:上个月,CN与Tundra Energy Marketing Ltd.签署了一项谅解备忘录,在曼尼托巴省Cramer附近建设一个原油铁路车装卸站,以满足曼尼托巴省和萨斯喀彻温省Bakken页岩原油生产商的需求。 CN官员在一份准备好的声明中说,从2013年第二季度开始,该航站楼的最初设计目标是每天铁路运输30,000桶原油,并容纳100辆车的列车。 Tundra Energy总裁Bryan Lankester说,新的码头将帮助Tundra Energy在Williston盆地原油进入北美另类市场的时候,“管道输送能力不足”。

著录项

  • 来源
    《Progressive Railroading》 |2012年第11期|9-9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号