...
【24h】

VARYING THE LOAD

机译:改变负载

获取原文
获取原文并翻译 | 示例
           

摘要

On sept. 10, Patriot Coal Corp. announced plans to idle a CSX Corp.-served surface coal mine, preparation plant and rail load-out facility near Man, VV.Va. Company officials made the move to better align production with projected sales. Patriot Coal is contending with thermal coal prices that have fallen well below production costs at many Central Appalachian mines, said President and Chief Executive Officer Bennett Hatfield in a press release. "Thermal coal markets are extremely weak due to low natural gas prices and costly regulatory changes that have reduced coal-fueled electricity generation capacity," he said.
机译:在9月。 10月10日,爱国者煤炭公司(Patriot Coal Corp.)宣布计划让CSX Corp.所服务的露天煤矿,选矿厂和铁路装卸设施在VV.Va的Man附近闲置。公司官员采取了行动,使生产与预期的销售更好地保持一致。总裁兼首席执行官贝内特·哈特菲尔德(Bennett Hatfield)在一份新闻稿中说,爱国者煤炭公司(Patriot Coal)正在与动力煤价格竞争,该价格已经远远低于许多阿巴拉契亚中部煤矿的生产成本。他说:“由于低廉的天然气价格和昂贵的法规变化,热煤市场非常疲软,这降低了以煤为燃料的发电能力。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号