...
【24h】

[TRANSIT]

机译:[TRANSIT]

获取原文
获取原文并翻译 | 示例
           

摘要

METROLINK LAUNCHES TIER 4 LOCOMOTIVE TESTS In early June, California's Metrolink began testing locomotives that meet the Environmental Protection Agency's Tier 4 emissions standard. The testing will continue through the summer now that the the Federal Railroad Administration has given its approval to begin the process. After the testing period concludes, Metrolink will start deploying the new locomotives across its system. Built by Progress Rail, the new units are expected to reduce particulate matter and nitrogen oxide emissions by up to 85 percent, according to Metrolink.
机译:METROLINK推出4级机车测试6月初,加利福尼亚州的Metrolink开始测试符合环境保护局4级排放标准的机车。联邦铁路管理局(Federal Railroad Administration)已批准开始该过程,因此测试将持续到整个夏天。测试期结束后,Metrolink将开始在其系统中部署新机车。据Metrolink称,这些新装置由Progress Rail建造,有望减少高达85%的颗粒物和氮氧化物排放。

著录项

  • 来源
    《Progressive Railroading》 |2017年第7期|9-10|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号