The performance of open-ended piles can be different from that of closed piles due to the effect of soil plugging. This paper presents the results of a large-scale field pile load test conducted on an open-ended pile in clay under static compressive loads. A prestressed high-strength concrete pipe pile with an outer diameter of 400 mm and a wall thickness of 75 mm was instrumented with strain sensors and installed in a marine deposit for static load testing. The measured load-transfer data during pile installation and the pile load test results are reported and analysed. The data show that the pile was in a partially plugged condition during jacking and behaved in a fully plugged mode in the static load test. The measured ultimate shaft resistance and total resistance of the test pile were 659 and 1180 kN, respectively, which were smaller than the values calculated using a previously proposed method. The back-calculated alpha and beta values (as used in the alpha and beta methods) for axial pile capacity in marine deposits were 0.42 and 0.56, respectively.
机译:由于堵土的影响,开放式桩的性能可能与封闭式桩的性能不同。本文介绍了在静压荷载下在粘土中的开放式桩上进行的大规模现场桩荷载试验的结果。使用应变传感器对外径为400 mm,壁厚为75 mm的预应力高强度混凝土管桩进行测量,并将其安装在海洋沉积物中以进行静载荷测试。报告并分析桩安装过程中测得的载荷传递数据和桩载荷测试结果。数据显示,在顶进过程中,桩处于部分堵塞的状态,在静载荷测试中,桩处于完全堵塞的状态。测得的测试桩的极限竖井阻力和总阻力分别为659和1180 kN,均小于使用先前提出的方法计算的值。反算的海洋沉积物轴向桩容量的alpha和beta值(用于alpha和beta方法)分别为0.42和0.56。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号