首页> 外文期刊>Proceedings of the Institution of Civil Engineers. Civil Engineering >Implementation and challenges on the Doha Metro project, Qatar
【24h】

Implementation and challenges on the Doha Metro project, Qatar

机译:卡塔尔多哈地铁项目的实施和挑战

获取原文
获取原文并翻译 | 示例
           

摘要

The new Doha Metro is a key part of the State of Qatar's integrated rail network project, which was commissioned by the government in 2011. The first 12.5 pound billion phase of the capital city's metro, including 86 km of track, 112km of tunnels and 37 stations, will open in 2020 after just 8 years of construction - and comfortably ahead of the 2022 FIFA World Cup. Delivery of this large urban project in challenging geotechnical, environmental and political conditions is being achieved without compromising safety, quality, programme or budget. This paper outlines the engineering approaches applied, the challenges faced and the innovative procurement, technical and safety solutions adopted.
机译:新的多哈地铁是卡塔尔国综合铁路网项目的关键部分,该项目于2011年由政府委托运营。首都城市地铁的第一个12.5万亿英镑的建设​​阶段,包括86公里的轨道,112公里的隧道和37公里加油站将在短短8年的建设后于2020年开放-舒适地领先于2022年FIFA世界杯。在具有挑战性的岩土,环境和政治条件下完成了这个大型城市项目的交付,而没有损害安全性,质量,计划或预算。本文概述了应用的工程方法,面临的挑战以及采用的创新采购,技术和安全解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号