TRUTH AND MYTHS CONCERNING TIDAL POWER PLANTS

机译:潮汐电厂的真相与神话

获取原文
获取原文并翻译 | 示例
           

摘要

The expediency of TiPP construction is the subject of a critical review.rnIn the past decade, scientific-research and design-survey studies involving tidal power plants (TiPP) have been activated in Russia. The introduction of megaTiPP has appeared in the "General plan for disposition of power-industry projects to 2020," "Program for development of Russian water power in the period to 2020 and prospects to 2030," and other plans and investment documents. In the "General plan…," for example, it had been proposed to introduce the 700-MW Mezenskaya and 200-MW Tugurskaya TiPP prior to 2020. In the "Program for development…," the publicly owned joint-stock company GidroOGK has been commissioned to introduce the 12-MW Severn TiPP in 2010, the 2500-MW Mezenskaya TiPP in 2019-2020, and the 510-MW Tugurskaya TiPP in 2020. The author of this paper has repeatedly cautioned against the untimeliness and inexpediency of these plans. This same viewpoint is held by a majority of designers and hydraulic-power engineers.
机译:TiPP施工的便利性是一项严格的审查的主题。在过去的十年中,俄罗斯启动了涉及潮汐发电厂(TiPP)的科学研究和设计调查研究。 megaTiPP的引入已出现在“到2020年的电力工业项目处置总体计划”,“到2020年的俄罗斯水电发展计划以及到2030年的前景”以及其他计划和投资文件中。例如,在“总体规划……”中,有人提议在2020年之前引入700兆瓦的Mezenskaya和200兆瓦的Tugurskaya TiPP。在“发展计划……”中,上市股份公司GidroOGK拥有曾受委托在2010年推出12兆瓦的Severn TiPP,在2019-2020年推出2500兆瓦的Mezenskaya TiPP和2020年推出510兆瓦的Tugurskaya TiPP。本文的作者多次告诫这些计划的不切实际和不便之处。大多数设计师和液压动力工程师也持相同观点。

著录项

  • 来源
    《Power technology and engineering》 |2009年第6期|P.345-351|共7页
  • 作者

    G G Lapin;

  • 作者单位

    Editorial Office of the journal 'Gidrotechnicheskoc Stroitel'stvo,' Moscow, Russia;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号