...
首页> 外文期刊>Hydrotechnical Construction >POSSIBILITIES FOR OPTIMIZING THE SELF-STARTING PROCESS OF AUXILIARY ELECTRIC MOTORS AT A NUCLEAR POWER PLANT
【24h】

POSSIBILITIES FOR OPTIMIZING THE SELF-STARTING PROCESS OF AUXILIARY ELECTRIC MOTORS AT A NUCLEAR POWER PLANT

机译:优化核电站辅助电动机自启动过程的可能性

获取原文
获取原文并翻译 | 示例
           

摘要

The existing technique of switching on the auxiliary reserve network of an NPP formulates the switch-on commands directly after a shutdown. Due to delay in activating the automatic switch, the command is completed with a certain time delay. The nature of the subsequent processes is not very predictable. It is proposed to determine, based on developed computer models of the actual equipment, the moments of formation of the reserve activation commands, thus ensuring smaller perturbations at the subsequent switch-on.
机译:NPP辅助备用网络的现有接通技术是在关机后直接制定接通命令的。由于激活自动开关的延迟,该命令会在一定的时间延迟内完成。后续过程的性质不是非常可预测的。建议基于开发的实际设备的计算机模型确定储备激活命令的形成时刻,从而确保在随后的接通时产生较小的扰动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号