首页> 外文期刊>Power technology and engineering >GEODETIC MONITORING OF LARGE-SPAN UNDERGROUND FACILITIES DURING CONSTRUCTION OF THE ROGUN HYDROELECTRIC POWER STATION
【24h】

GEODETIC MONITORING OF LARGE-SPAN UNDERGROUND FACILITIES DURING CONSTRUCTION OF THE ROGUN HYDROELECTRIC POWER STATION

机译:罗贡水电站建设期间大跨度地下设施的大地监测

获取原文
获取原文并翻译 | 示例
           

摘要

Problems related to the creation and functional operation of a system of geodetic monitoring of large-span underground facilities at the Rogun hydroelectric power station are considered as functions of the engineering geology conditions of occurrence of the rock. Results of long-term regime geodetic measurements are presented. The process of activation and the significant scatter of the degree of convergence of the walls of the machine hall chamber in the siltstone and sandstone zones are identified.
机译:与Rogun水电站大跨度地下设施大地测量系统的创建和功能运行有关的问题被视为岩石发生的工程地质条件的函数。给出了长期方案大地测量的结果。确定了粉砂岩和砂岩区域中机房室壁的活化过程和会聚程度的显着分散。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号