Tenaska's 885 MW combined-cycle Central Alabama Generating Station in Billingsley, Alabama, entered operation in May 2003 and quickly proved its mettle, achieving a summer availability of 99.04% and a perfect safety record with zero recordable injuries. The 3x1 plant consists of three GE 7FA gas turbines, three Deltak triple-pressure heat recovery steam generators, and a single GE D11 steam turbine. The plant operates under a long-term tolling agreement; the customer supplies the fuel for the plant and markets the power output. Daily cycling is the most common dispatch scenario at Central Alabama. A key ingredient in Tenaska's approach to power plant ownership and operation is applying lessons learned from elsewhere in the Tenaska fleet. "We call this knowledge leveraging," says Robert Threlkeld, Plant Manager at Central Alabama. "For us, the lessons learned at other Tenaska plants during start-up and their first summer seasons have translated directly into improved performance here, as shown by our availability record."
机译:Tenaska位于阿拉巴马州Billingsley的885 MW联合循环中央阿拉巴马州发电站于2003年5月投入运行,并迅速证明了自己的勇气,实现了夏季99.04%的利用率和完美的安全记录,可记录伤害为零。 3x1工厂由三台GE 7FA燃气轮机,三台Deltak三压力热回收蒸汽发生器和一台GE D11蒸汽轮机组成。该工厂根据长期收费协议运营;客户为工厂提供燃料并销售功率输出。每天骑自行车是阿拉巴马州中部最常见的调度方案。特纳斯卡(Tenaska)拥有和运营电厂的方法的关键要素是借鉴从特纳斯卡(Tenaska)机队其他地方汲取的经验教训。 “我们称这种知识为杠杆,”阿拉巴马州中部工厂经理Robert Threlkeld说。 “对我们来说,从可用性记录中可以看出,在Tenaska的其他工厂在启动和最初的夏季收获的经验直接转化为此处的性能改善。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号