首页> 外文期刊>Power Engineering >Planning, Testing & Integration are Keys for Successful Wind projects
【24h】

Planning, Testing & Integration are Keys for Successful Wind projects

机译:计划,测试和集成是Wind项目成功的关键

获取原文
获取原文并翻译 | 示例
           

摘要

Over the past decade, wind energy has moved from a small and novel technology to a major portion of new energy construction. The size and complexity of wind projects has increased and many companies previously focused on fossil generation have now shifted considerable attention to wind. Black & Veatch has observed that the maturity with which wind projects are designed and built has not always kept up with its place in mainstream energy generation.
机译:在过去的十年中,风能已经从一种新颖的小型技术转移到了新能源建设的主要部分。风力发电项目的规模和复杂性都在增加,许多以前专注于化石发电的公司现在已经将相当多的注意力转移到了风力发电上。布莱克&韦奇(Black&Veatch)观察到,风能项目的设计和建造并不总是跟上其在主流能源生产中的地位。

著录项

  • 来源
    《Power Engineering》 |2009年第9期|5860-62|共4页
  • 作者

    Ryan Jacobson;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号