首页> 外文期刊>Power Engineering >NUCLEAR UTILITIES BALK AT PAYMENTS
【24h】

NUCLEAR UTILITIES BALK AT PAYMENTS

机译:核实用程序付款

获取原文
获取原文并翻译 | 示例
           

摘要

Nuclear utilities say that they shouldn't have to pay an estimated $769 million this year toward a waste repository since the US is abandoning the Yucca Mountain site and hasn't settled on another disposal plan. Pres Barack Obama said earlier this year in budget documents that the US would no longer seek to build a nuclear waste repository at Yucca Mountain, NV. Utilities already have won court decisions allowing them to collect damages, now thought to run well over $20 billion, from the federal government for their extra costs -- including building temporary steel-and-concrete silos to store spent fuels.
机译:核电公司表示,由于美国正在放弃尤卡山遗址,并且尚未达成另一项处置计划,他们今年不必为废物处置库支付约7.69亿美元。巴拉克·奥巴马(Pres Barack Obama)今年早些时候在预算文件中表示,美国将不再寻求在内华达州尤卡山(Nucca Mountain)建立核废料处置库。公用事业公司已经赢得了法院的裁决,允许他们从联邦政府那里收取大约200亿美元的损失,这笔费用来自联邦政府,这笔额外费用包括建造临时的钢筋混凝土筒仓来存储乏燃料。

著录项

  • 来源
    《Power Engineering》 |2009年第8期|p.76-76|共1页
  • 作者

    Anonymous;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号