...
首页> 外文期刊>Polish Journal of Environmental Studies >A Comprehensive Assessment Method for Safety Risk of Gas Tunnel Construction Based on Fuzzy Bayesian Network
【24h】

A Comprehensive Assessment Method for Safety Risk of Gas Tunnel Construction Based on Fuzzy Bayesian Network

机译:基于模糊贝叶斯网络的气体隧道施工安全风险综合评价方法

获取原文
获取原文并翻译 | 示例
           

摘要

Currently, gas disasters in tunnels occur frequently and cause severe casualties and property losses. However, there are few studies on the risk assessment of gas tunnels, especially comprehensive analysis of the safety risk of gas tunnels considering multiple factors. This paper presents a comprehensive assessment method for safety risk of gas tunnel construction based on fuzzy Bayesian network. The results of safety risk assessment are determined by two aspects: risk probability and risk hazard. In the process of assessment, 12 risk indicators were extracted from 32 important factors by the principal component analysis method, and a fuzzy interpretative structural modeling was established and converted into a fuzzy Bayesian network to evaluate the risk probability. The risk index weight was obtained through principal component analysis, and the risk hazard level was calculated by using the fuzzy comprehensive assessment method in combination with the hazard degree of the risk index. After a comprehensive assessment of gas concentration and other field conditions, the relevant parameters such as the fuzzy interpretative structural modeling and fuzzy Bayesian network are determined. This paper selects two construction segments of the Like tunnel as case studies to verify the feasibility and application prospects of this method. The method establishes a safety risk assessment model for gas tunnels, which can allow management personnel to fully evaluate gas tunnel risk and provides a safe construction environment.
机译:目前,隧道中的气体灾害频繁发生并导致严重伤亡和财产损失。然而,少数关于气隧道风险评估的研究,特别是对考虑多个因素的燃气隧道安全风险的全面分析。本文介绍了基于模糊贝叶斯网络的气体隧道施工安全风险的综合评估方法。安全风险评估结果由两个方面决定:风险概率和风险危害。在评估过程中,通过主要成分分析方法从32个重要因素提取12个风险指标,并建立了模糊解释性结构建模并转换为模糊贝叶斯网络,以评估风险概率。通过主成分分析获得风险指数重量,通过使用模糊综合评估方法与风险指数的危害程度结合使用模糊综合评估方法计算风险危险水平。在全面评估气体浓度和其他场地条件后,确定了模糊解释性结构建模和模糊贝叶斯网络等相关参数。本文选择了两种隧道的施工区段,以验证该方法的可行性和应用前景。该方法为燃气隧道建立了安全风险风险评估模型,可以允许管理人员充分评估天然气隧道风险并提供安全的施工环境。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号