首页> 外文期刊>Platts Megawatt Daily >SoCal Ed can seek more energy storage to address Aliso
【24h】

SoCal Ed can seek more energy storage to address Aliso

机译:SoCal Ed可以寻求更多的能量存储来解决Aliso

获取原文
获取原文并翻译 | 示例
           

摘要

Southern California Edison can procure at least 20 MW of energystorage projects to alleviate power supply shortages in the LosAngeles area due to Aliso Canyon, the California Public UtilitiesCommission decided Thursday.The plan responds to a 2017 state law that required new costeffectivestorage projects to mitigate the impact of the well failure atAliso Canyon. Under the law, the storage projects must be owned bythird parties must be capable of providing a four-hour durationresource adequacy service.This is not the first time the state has sought storage to addressAliso Canyon. In 2016, CPUC required SoCal Ed to conduct an expeditedprocurement and allowed San Diego Gas & Electric to expedite storagefrom a related solicitation, resulting in almost 100 MW of grid-levelstorage, the order noted.
机译:加利福尼亚公共事业委员会周四决定,南加州爱迪生公司可以采购至少20兆瓦的能源存储项目,以缓解因阿里索峡谷(Aliso Canyon)造成的洛杉矶地区电力供应短缺。该计划是对2017年州法律的回应,该法律要求新的具有成本效益的存储项目以减轻影响阿里索峡谷的油井故障。根据法律,仓储项目必须归第三方所有,并且必须能够提供四小时持续时间的资源充足性服务,这不是该州首次寻求仓储来解决阿里索峡谷问题。该命令指出,2016年,CPUC要求SoCal Ed进行快速采购,并允许San Diego Gas&Electric通过相关招标加快存储速度,从而导致近100 MW的电网级存储。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号