首页> 外文期刊>Platts Megawatt Daily >BLM comment period on 690-MW solar facility in Nevada ends September 5
【24h】

BLM comment period on 690-MW solar facility in Nevada ends September 5

机译:BLM对内华达州690兆瓦太阳能设施的评论期于9月5日结束

获取原文
获取原文并翻译 | 示例
           

摘要

The comment period on a proposed 690-MW utility-scale solar generating facility in Nevada will end September 5, according to the US Bureau of Land Management, which has been evaluating what could eventually become the US’ largest solar generating facility. The Gemini Solar Project, which has been proposed by Quinbrook Infrastructure Partners and Arevia Power, is projected to be built on 7,100 acres of BLM-administered lands approximately 33-miles northeast of Las Vegas and just south of the Moapa River Indian Reservation in Clark County.
机译:据美国土地管理局称,内华达州一座拟议的690兆瓦公用事业规模太阳能发电设施的评议期将于9月5日结束,该局一直在评估最终可能成为美国最大的太阳能发电设施的情况。由Quinbrook基础设施合作伙伴和Arevia Power提出的Gemini太阳能项目,预计将建在7100英亩由BLM管理的土地上,位于拉斯维加斯东北约33英里处,位于克拉克县Moapa河印第安人保护区的南部。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号