首页> 外文期刊>Platts Megawatt Daily >El Paso Electric’s renewables, gas plant plans draw mixed reactions
【24h】

El Paso Electric’s renewables, gas plant plans draw mixed reactions

机译:埃尔帕索电力可再生能源,天然气厂计划引起不同反应

获取原文
获取原文并翻译 | 示例
           

摘要

El Paso Electric plans to rely on a combination of solar, wind, battery storage and natural gas generation to meet its peak demand needs in 2022-23, the company announced Wednesday, which drew mixed reactions Thursday from industry observers. The investor-owned utility, which has customers in Texas and New Mexico, announced Wednesday its selections from a competitive 2017 request for proposals for electric power supply and load-management resources, anticipating a need of 50 MW by 2022 and 320 MW more by 2023. The winning bids include the purchase of 200 MW from utility-scale solar and 100 MW from battery storage. EPE also approved plans to build a 226-MW natural gas combustion turbine at the company’s existing 752-MW Newman Power Station, with commercial operation to start in 2023 at an expected cost of $143 million. The company also expects to buy 50 MW to 150 MW of wind and solar power “to provide for fuel diversity and energy cost savings,” according to a news release.
机译:该公司周三宣布,埃尔帕索电气公司计划依靠太阳能,风能,电池存储和天然气发电来满足其2022-23年的峰值需求,这引起了业界观察家的不同反应。这家由投资者拥有的公用事业公司在得克萨斯州和新墨西哥州都有客户,该公司周三宣布了其在2017年竞争激烈的电力供应和负载管理资源申请书中的选择,预计到2022年将有50兆瓦的需求,到2023年将有320兆瓦的需求。中标者包括从公用事业规模的太阳能购买200兆瓦,从电池存储购买100兆瓦。 EPE还批准了在公司现有的752兆瓦纽曼电站上建造一台226兆瓦的天然气涡轮机的计划,商业运营将于2023年开始,预计成本为1.43亿美元。该公司还希望购买50兆瓦至150兆瓦的风能和太阳能,以“提供燃料多样性并节省能源成本”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号