...
首页> 外文期刊>Platts Energy Trader >Southern California Edison battery contracts approved to replace gas generation
【24h】

Southern California Edison battery contracts approved to replace gas generation

机译:南加州爱迪生电池合同获准更换天然气发电

获取原文
获取原文并翻译 | 示例
           

摘要

The California Public Utilities Commission on Dec. 5 approved SouthernCalifornia Edison Co.'s request to procure 95 MW of energy storage tohelp offset the partial shutdown of the Aliso Canyon natural gasstorage facility and also to meet local capacity requirements in an areaof its service territory near Moorpark, California."By satisfying two objectives at one cost, these projects providegreater value to ratepayers," regulators said in their resolutionapproving the contracts, which have start dates in 2020 and 2021. Thesystems will support the state's reliability goals "by reducing localelectric demand and natural gas demand."
机译:加利福尼亚公用事业委员会于12月5日批准了Southern California Edison Co.的要求,以购买95 MW的能源存储以帮助抵消Aliso Canyon天然气存储设施的部分关闭,并满足其服务区域附近区域的当地容量要求。加州监管机构在批准合同的决议中说:“通过一次成本满足两个目标,这些项目为纳税人提供了更大的价值。”该合同的批准日期为2020年和2021年。该系统将通过减少本地电力需求来支持州的可靠性目标。和天然气需求。”

著录项

  • 来源
    《Platts Energy Trader》 |2019年第6期|2024-26|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号