首页> 外文期刊>Energy economist >Tax credit extension boosts Texan wind development
【24h】

Tax credit extension boosts Texan wind development

机译:税收抵免的扩展促进了德克萨斯州风能的发展

获取原文
获取原文并翻译 | 示例
           

摘要

Wind farm development activity is "robust" in Texas and the Southwest US, as utilities and wind developers alike seek to take advantage of an extended federal production tax credit, according to the executive director of The Wind Coalition. Jeff Clark said several utilities in the Southwest Power Pool and Electric Reliability Council of Texas regions have issued - and in some cases concluded -quick-turnaround solicitations for wind power aimed at wind projects on which construction could begin by end-2013 - a requirement for PTC qualification. Austin Energy, for example, concluded a wind RFP in June by entering into three Power Purchase Agreements for a total of 570 MW of wind power - from $23 to $33/MWh. Duke Energy Renewables will build a total of 400 MW of wind capacity in South Texas's Starr County, while E.On Climate & Renewables will build a 170 MW wind farm in Nueces County, Texas.
机译:The Wind Coalition的执行董事称,在德克萨斯州和美国西南部,风电场的开发活动“很稳健”,因为公用事业和风能开发商都试图利用扩大的联邦生产税收抵免。杰夫·克拉克(Jeff Clark)说,得克萨斯州西南电力池和电力可靠性委员会的多家公用事业公司已经发布了针对风力发电项目的快速周转招标书,并在某些情况下得出了结论,针对风能项目的招标可在2013年底开始施工, PTC资格。例如,奥斯汀能源公司(Austin Energy)在6月份签署了三份《电力购买协议》,签订了一项风电RFP协议,总计570兆瓦的风电-从$ 23到$ 33 / MWh。杜克能源可再生能源公司将在南得克萨斯州的斯塔尔县建设总计400兆瓦的风力发电能力,而E.On Climate&Renewables将在德克萨斯州Nueces县建设一个170兆瓦的风力发电场。

著录项

  • 来源
    《Energy economist》 |2013年第382期|46-46|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号