...
首页> 外文期刊>Energy in East Europe >Eft Secures Stanari Tpp Concession
【24h】

Eft Secures Stanari Tpp Concession

机译:Stanara轴是Tpp CONCESSION

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Anglo-Swiss power trader Energy Financing Team (EFT) signed February 25 an agreement with the Bosnian Serb government for the construction and operation of a 420-MW lignite-fired thermal power plant in Stanari near the northern town of Doboj.rnThe agreement provides EFT with a 30-year concession for the construction and operation of the power plant, with the option to extend the concession for a further 15 years, spokesman Nenad Savic told Platts, February 25. Under the terms of the concession, EFT will pay the government a one-off fee of €1.85 million as well as 3.6% of the plant's annual income, which EFT conservatively estimates will cost it around €5 million. Annual income from the plant, construction of which is expected to start later this year and which is due to enter commercial operation by the end of 2012, has been estimated at €153 million ($227 million).
机译:英瑞电力贸易商能源融资团队(EFT)于2月25日与波斯尼亚塞族政府签署了一项协议,以在北部城镇Doboj附近的Stanari建设和运营一座420 MW褐煤火力发电厂。发言人内纳德·萨维奇(Nenad Savic)于2月25日告诉普氏能源资讯,该电厂的建设和运营特许权为30年,可以选择将特许权再延长15年。一笔一次性费用为185万欧元,占该厂年收入的3.6%,据EFT保守估计,这笔费用约为500万欧元。该工厂的年收入估计为1.53亿欧元(2.27亿美元),该工厂的建设预计于今年晚些时候开始,并将于2012年底投入商业运营。

著录项

  • 来源
    《Energy in East Europe》 |2008年第134期|8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号