首页> 外文期刊>Pipeline & gas journal >Pigging Continues On Strong Course Worldwide
【24h】

Pigging Continues On Strong Course Worldwide

机译:在全球范围内继续努力进行清管

获取原文
获取原文并翻译 | 示例
           

摘要

Pigging's maturity has led to fundamental changes in the approach to initial assessments and the long-term management of pipeline servicing and integrity mon-itoring. Some recent advances and operational successes are described in this article. Pipeline operators are increasingly using independent specialist consultants to advise them on all aspects of pigging -from assessing the needs to repairing any significant damage found. Penspen, for example, has further fine-honed its dedicated pipeline services worldwide. It claims to be bringing major cost savings to many customers on both cleaning and smart pig runs by first considering the actual need for the runs and then ensuring that the correct tools and procedures are adopted. Penspen also offers a complete contract negotiation, field management, and data assessment service.
机译:清管的成熟已导致对初始评估方法以及管道服务和完整性监控的长期管理方式的根本性改变。本文介绍了一些最新进展和操作成功。管道运营商越来越多地使用独立的专业顾问,为他们提供清管各个方面的建议-从评估需求到修复发现的任何重大损坏。例如,彭斯彭(Penspen)在全球范围内进一步完善了其专用管道服务。它声称通过首先考虑运行的实际需求,然后确保采用正确的工具和程序,可以为清洁和智能生猪运行的许多客户节省大量成本。 Penspen还提供完整的合同谈判,现场管理和数据评估服务。

著录项

  • 来源
    《Pipeline & gas journal》 |2005年第8期|p.262830-3234-36|共8页
  • 作者

    Bryan Clark;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道运输;煤炭气化工业;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号