首页> 外文期刊>Pipeline & gas journal >Keystone Pipeline Project Moving Toward Completion
【24h】

Keystone Pipeline Project Moving Toward Completion

机译:Keystone管道项目即将完成

获取原文
获取原文并翻译 | 示例
           

摘要

Construction on TransCanada Corporation's long-distance, large-diameter C$5.2 billion Keystone crude oil pipeline reaching from Canada's Alberta oil fields to markets in the U.S. Midwest is grinding to completion after more than two years of intensive construction activity. The Keystone construction scope involved building a 2,148-mile, 30- and 36-inch pipeline to transport up to 590,000 bpd from the terminal and storage facilities at Hardisty, Alberta to markets at Wood River and Patoka, IL and on to Cushing, OK.
机译:TransCanada Corporation的长途,大直径52亿加元的Keystone原油管道从加拿大的艾伯塔省油田到美国市场的建设。经过两年多的密集建设活动,该管道正在打磨并竣工。 Keystone的建设范围涉及建设一条2,148英里,30和36英寸的管道,以将高达590,000 bpd的日产量从艾伯塔省Hardisty的码头和仓储设施运输到伊利诺伊州伍德河和帕托卡的市场,再到俄克拉何马州库欣。

著录项

  • 来源
    《Pipeline & gas journal》 |2010年第9期|p.30323436|共4页
  • 作者

    Buddy Ives;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号