首页> 外文期刊>Pipeline & gas journal >Direct Pipe Method Proves Out In First Use In U.S.
【24h】

Direct Pipe Method Proves Out In First Use In U.S.

机译:直接管道法在美国首次使用证明

获取原文
获取原文并翻译 | 示例
           

摘要

Special to Pipeline &Gas Journal Rome Directional installed three undergrround popelines using ther Direct pipe method for the first time in the Oited suites. First use of the system was in where REM Directional installed a natural gas pipeline under a highway utilizing the Direct pipe method natural gas pipeline under Highway 70. This successful pioneer run was completed in just three days. During the installation, REM also implemented the use of a Pipe Thruster, which can apply an additional 500 metric tons of pushing and pulling power when used to aid horizontal directional drilling (HDD) rigs.
机译:《管道与天然气杂志》特刊《罗马定向》在Oited套件中首次使用直接管道法安装了3条地下管道。该系统的首次使用是在REM定向公司利用70号高速公路下的直接管道天然气管道在高速公路下安装了天然气管道的情况下。成功的先驱运行仅用了三天就完成了。在安装过程中,REM还实施了管道推力器的使用,当用于辅助水平定向钻探(HDD)钻机时,该推力器可施加额外的500吨推拉力。

著录项

  • 来源
    《Pipeline & gas journal》 |2011年第5期|p.26-29|共4页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号