首页> 外文期刊>Pipeline & gas journal >Meeting the Challenges
【24h】

Meeting the Challenges

机译:迎接挑战

获取原文
获取原文并翻译 | 示例
           

摘要

An icon for PG&E's turnaround is its state-of-the-art Gas Control Center located in an East San Francisco Bay suburb, and Senior Vice President Jesus Soto points to it as demonstrating the company's enhanced safety and reliability in its gas operations. In fall 2015, the control center under the leadership of Manager Andy Wenzel and Supervisor Robert Quijalvo and their team isolated and shut down a 34-inch, 750-psi transmission pipeline in the energy-agricultural central valley near Bakersfield, CA, in 14 minutes after a bulldozer cut into the pipeline.
机译:PG&E转型的一个标志是其位于旧金山东湾郊区的最先进的气体控制中心,高级副总裁Jesus Soto指出,这表明PG&E证明了该公司在天然气业务中增强的安全性和可靠性。 2015年秋天,在经理安迪·温泽尔(Andy Wenzel)和主管罗伯特·奎加尔沃(Robert Quijalvo)及其团队的领导下,控制中心在14分钟内隔离并关闭了加利福尼亚州贝克斯菲尔德附近能源农业中央山谷中一条34英寸,750 psi的传输管道在推土机切入管道后。

著录项

  • 来源
    《Pipeline & gas journal》 |2016年第6期|26-26|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号