首页> 外文期刊>Pipeline & gas journal >Tellurian Withdraws Application for Permian Global Access Pipeline
【24h】

Tellurian Withdraws Application for Permian Global Access Pipeline

机译:Tellurian撤回了Permian Global Access Pipeline的申请

获取原文
获取原文并翻译 | 示例
           

摘要

Liquefied natural gas (LNG) developer Tellurian told federal energy regulators it wants to withdraw its application to build the Permian Global Access natural gas pipeline in Texas and Louisiana.The filing with the U.S. Federal Energy Regulatory Commission (FERC) came a day after Tellurian said its President and Chief Executive Meg Gentle will leave the company.The 625-mile (1,005-km) Permian pipeline was designed to transport up to 2.3 Bcf/d (65 MMcm/d) of gas from the Permian Shale in West Texas and eastern New Mexico to southwest Louisiana near where Tellurian wants to build the Driftwood LNG export plant.In what has been a tough year for the LNG industry after coronavirus demand destruction caused global energy prices to collapse, Tellurian said in the filing that "current market conditions do not support the economic thresholds to pursue the [Permian pipe] further at this time."
机译:液化天然气(LNG)开发商Tellurian告诉联邦能源监管机构,它希望撤回其申请,以建立德克萨斯州和路易斯安那州的二叠纪全球进入天然气管道。与美国联邦能源监管委员会(FERC)提交的申请是在特鲁人说其总裁兼首席执行官Meg温柔将离开本公司。625英里(1,005公里)的二叠系管道旨在从西德克萨斯州西德克萨斯州和东部的二叠纪页岩运输高达2.3 BCF / D(65 mmcm / d)新墨西哥州到西南路易斯安那州附近的雷尔兰想建造浮木液化植物出口厂。欧洲甘油血清血清血清毒素需求破坏后,液化天然气行业的艰难年份是什么艰难的一年,导致全球能源价格崩溃,在提交“当前市场条件下目前不支持经济阈值进一步追求[二叠系管]。“

著录项

  • 来源
    《Pipeline & gas journal》 |2021年第1期|14-14|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号