首页> 外文期刊>PCI Journal >UGA's Carlton Street Parking Facility Meets University Demands for Construction Speed and Aesthetics
【24h】

UGA's Carlton Street Parking Facility Meets University Demands for Construction Speed and Aesthetics

机译:UGA的卡尔顿街停车设施可满足大学对施工速度和美学要求

获取原文
获取原文并翻译 | 示例
           

摘要

Administrators' at the University of Georgia (located in Athens, Georgia) needed to construct and open a new 260,000 sq ft (24200 m~2) parking structure in time for the fall season's first football game, less than eight months away, while meeting specific aesthetic requirements for campus architecture. An all-precast concrete structure met the specified requirements, including spandrels with inset brick to blend with surrounding university buildings. The final design emphasized classical architectural elements, including the appearance of stone arches and fenestrations, a heavily rusticated base, and an ornamental cornice. The precast structure proved especially efficient when unexpected soil conditions on a congested site had to be addressed prior to the start of construction. The success of this project in meeting a short construction deadline while producing a cost-effective and aesthetically pleasing design for the University led to its selection as Best All-Precast Solution in the 2002 PCI Design Awards Program.
机译:佐治亚大学(位于佐治亚州雅典市)的行政管理人员需要在不超过8个月的秋季足球比赛召开之前及时建造并开放一个新的260,000平方英尺(24200 m〜2)停车结构,以赶上秋季的第一次足球比赛校园建筑的特定美学要求。全预制混凝土结构满足指定要求,包括带有嵌入砖的墙托与周围的大学建筑融合。最终设计强调了古典建筑元素,包括石拱和窗饰的外观,坚固的底座和装饰性檐口。当必须在施工开始之前解决拥挤现场的意外土壤条件时,预制结构特别有效。该项目成功地在短时间内完成了施工,同时又为大学提供了具有成本效益和美观的设计,因此被选为2002年PCI设计奖计划中的最佳全预制解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号