Westinghouse executive says testing 50% complete at Sanmen-1, Haiyang-1

机译:西屋公司高管表示,在三阳一号,海阳一号完成了50%的测试

获取原文
获取原文并翻译 | 示例
           

摘要

Around 50% of the testing needed before commercial operation canrnbegin at the Sanmen-1 and Haiyang-1 AP1000 units in China is nowrncompleted, William Poirier, vice president, Westinghouse China AP1000rnprojects, said in an interview March 8.rnPoirier, who has been working as the project director for Sanmenrnsince 2005, said that 90% of the systems on the two units had beenrnmade available for testing, but noted that some of the testing hadrnbeen waiting for the arrival from the US of the reactor coolant pumpsrnfor the two units. Sanmen-1 and Haiyang-1 will be the first of fourrnAP1000 reactors to operate in China.
机译:西屋中国AP1000rn项目副总裁William Poirier在3月8日接受采访时说,目前已经完成了在中国的三门一号和海阳一号AP1000机组开始商业运营之前大约需要进行的50%的测试。作为Sanmenrnsince项目负责人(自2005年起)说,两台设备上的90%的系统已可供测试,但指出有些测试已经在等待这两台设备的反应堆冷却剂泵从美国运抵。 Sanmen-1和Haiyang-1将是在中国运行的四个rnAP1000反应堆中的第一个。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号