...
首页> 外文期刊>Nuclear waste news >Court Sides With NRC on Plan To Build Reprocessing Plant in N.M.
【24h】

Court Sides With NRC on Plan To Build Reprocessing Plant in N.M.

机译:与NRC一起在N.M.建造后处理厂的法院方面

获取原文
获取原文并翻译 | 示例
           

摘要

A federal appeals court has rejected an effort by anti-nuclear groups to block a nuclear fuel processing plant from being built in southeastern New Mexico.rnThe U.S. Court of Appeals in Washington, D.C., supported the U.S. Nuclear Regulatory Commission's 2006 decision to give Louisiana Energy Services a license to build the $1.5 billion uranium-enrichment plant.rnCritics, including the Nuclear Information and Resource Service, had argued that the agency failed to properly consider how to dispose of the plant's radioactive waste.rnThe project lies along the Texas border east of Eunice. Construction is under way, and Louisiana Energy Services expects to process its first batches of uranium in the summer of 2009.rnUranium processed at the factory would be used in nuclear plants to generate electricity.
机译:联邦上诉法院拒绝了反核团体阻止新墨西哥州东南部建造核燃料加工厂的努力。美国华盛顿特区的美国上诉法院支持美国核监管委员会2006年做出的将路易斯安那州能源授予路易斯安那州的决定。为建造这座耗资15亿美元的铀浓缩厂提供服务的执照。包括核信息与资源局在内的批评人士认为,该机构未能适当考虑如何处置该厂的放射性废物。该项目位于德克萨斯州东部的德克萨斯州边界太太建设工作正在进行中,路易斯安那州能源服务公司预计将在2009年夏季处理其第一批铀。在工厂处理过的铀将用于核电站发电。

著录项

  • 来源
    《Nuclear waste news》 |2008年第1期|8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号