...
首页> 外文期刊>Nuclear waste news >Inside This Issue
【24h】

Inside This Issue

机译:本期内容

获取原文
获取原文并翻译 | 示例
           

摘要

In early 2011, all radiological work at MFC was stopped and gradually resumed over a three-month period as BEA reviewed, modified, and approved work control documents; trained the workforce on the new procedures, and validated readiness to perform work. "BEA also initiated continuous improvement programs to correct weaknesses in these areas, but the implementation was not sufficiently mature to prevent either of the events," officials said. "Since the events, BEA has established and implemented additional corrective actions to address deficiencies identified in its internal evaluations of the events, a DOE Accident Investigation Board report on the ZPPR event, and the violations identified in the PNOV," DOE reported.
机译:2011年初,随着BEA审查,修改和批准了工作控制文件,MFC的所有放射工作都停止了并在三个月内逐步恢复;对员工进行新程序的培训,并验证其准备进行工作的准备。官员说:“东亚银行还启动了持续改进计划,以纠正这些方面的弱点,但实施还不够成熟,无法阻止任何一种事件。” DOE报告说:“自事件发生以来,BEA已经建立并实施了其他纠正措施,以解决事件内部评估中发现的缺陷,DOE事故调查委员会关于ZPPR事件的报告以及PNOV中发现的违规行为。”

著录项

  • 来源
    《Nuclear waste news》 |2012年第20期|1-1|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号