首页> 外文期刊>Nuclear waste news >Beshear Announces Process For Installing Permanent Cap at Maxey Flat Disposal Site
【24h】

Beshear Announces Process For Installing Permanent Cap at Maxey Flat Disposal Site

机译:Beshear宣布在Maxey Flat处置场安装永久盖的流程

获取原文
获取原文并翻译 | 示例
           

摘要

Kentucky Gov. Steve Beshear (D) announced a three-year process of installing a permanent cap at the Maxey Flat nuclear waste disposal site in Fleming County will begin next year. Beshear became the first governor to visit the 900-acre site near Hillsboro since the state took ownership of it in 1978. The state plans to spend approximately $35 million planting vegetation, managing surface water and installing markers that identify the location of buried waste. Radioactive waste sometimes has leaked from Maxey Flat into the environment, most recently in the late 1990s.
机译:肯塔基州州长史蒂夫·贝西阿(D)宣布了一项为期三年的程序,该程序将在明年开始在弗莱明县的Maxey Flat核废料处置场安装永久性顶盖。自1978年获得州所有权以来,Beshear成为第一位访问希尔斯伯勒附近900英亩土地的州长。该州计划花费约3500万美元用于种植植被,管理地表水和安装标识埋藏废物位置的标记。放射性废物有时是从Maxey Flat泄漏到环境中的,最近一次是在1990年代后期。

著录项

  • 来源
    《Nuclear waste news》 |2013年第14期|1-1|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号