...
首页> 外文期刊>Nuclear waste news >Hanford Crews Complete Demolition of Plutonium Processing Facility
【24h】

Hanford Crews Complete Demolition of Plutonium Processing Facility

机译:Hanford Crews完全拆除了钚加工设施

获取原文
获取原文并翻译 | 示例
           

摘要

The Hanford Site facility that produced two thirds of the nation's Cold War-era plutonium no longer exists. Workers recently demolished the Plutonium Finishing Plant's (PFP) main processing facility, after 40 years of operations and 20 years of cleanout and demolition preparation. "Removal of this iconic building forever changes the landscape at the Hanford Site and highlights a historic accomplishment in the Department of Energy's overall cleanup mission," said Tom Teynor, the federal project director for PFP demolition at the EM Richland Operations Office (RL). He continued, "Everyone who contributed to this achievement should be very proud of their efforts."
机译:产生了两三分之二的冷战时代钚的Hanford网站设施不再存在。 工作人员最近拆除了钚整理厂(PFP)主要加工设施,经过40年的运营和20年的清洁和拆迁准备。 “拆除这座标志性建筑永远改变了汉福德网站的景观,并突出了能源整体清理任务部的历史性成就,”美国皇家议案办公室(RL)的PFP拆迁联邦项目总监Tom Teynor说。 他继续,“为这一成就做出了贡献的大家,应该为他们的努力感到骄傲。”

著录项

  • 来源
    《Nuclear waste news》 |2020年第2期|a1-a1|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号