首页> 外文期刊>Nuclear news >OPG prepared for next Pickering restart project
【24h】

OPG prepared for next Pickering restart project

机译:OPG准备下一个Pickering重新启动项目

获取原文
获取原文并翻译 | 示例
           

摘要

The decision of Ontario Energy Minister Dwight Duncan to approve the restart of Pickering A Unit 1 (NN, Aug. 2004, p. 115) was very much dependent on his confidence that the new chairman of Ontario Power Generation (OPG), Jake Epp, and his management team, will be able to keep the project on course. Before being named chairman last December, Epp, a former federal cabinet minister, headed the Pickering A Review Panel, which reviewed the cost, schedule, reporting, and management of Unit 4's return to service. Its report, issued in December 2003, not only found mismanagement on the part of OPG, but also identified a lack of oversight by the previous government. Upon taking on the chairman's job, Epp also became a member of the OPG Review Committee, whose report recommended that the refurbishment of Pickering A Unit 1 should go ahead, as long as a number of important preparatory measures were completed before the start of major construction.
机译:安大略省能源部长德怀特·邓肯(Dwight Duncan)批准重新启动Pickering A Unit 1的决定(NN,2004年8月,第115页)在很大程度上取决于他是否相信安大略省发电局(OPG)的新董事长杰克·埃普(Jake Epp)和他的管理团队将能够使该项目继续进行。前联邦内阁大臣埃普(Epp)于去年12月被任命为主席之前,领导了皮克林A审查小组,该小组审查了第4单元恢复服务的成本,时间表,报告和管理。其于2003年12月发布的报告不仅发现OPG管理不善,还发现前任政府缺乏监督。在担任主席职务后,Epp还成为OPG审查委员会的成员,该委员会的报告建议,只要在重大建筑开始之前完成了许多重要的准备工作,就应该对Pickering A Unit 1进行整修。 。

著录项

  • 来源
    《Nuclear news》 |2004年第10期|p.30-38|共9页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 原子能技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号