【24h】

The cost of MOX

机译:MOX的成本

获取原文
获取原文并翻译 | 示例
           

摘要

In 1999, the UK government provisionally announced that full operation of SMP would be justified, but that further consideration and consultation on the economic arguments would be required. The consultation took place in June 1999. However, in August 1999, BNFL confirmed that quality control data of MOX fuel manufactured in the MOX demonstration facility (MDF) had been falsified. In the light of this incident -together with the submission by BNFL of a revised business case in 2001 (see NEI February 2001, p12) - the government decided further consideration was needed.
机译:在1999年,英国政府临时宣布SMP的全面运作是合理的,但是需要就经济论证进行进一步的考虑和协商。磋商于1999年6月进行。但是,BNFL在1999年8月证实,在MOX示范设施(MDF)中制造的MOX燃料的质量控制数据已被伪造。鉴于这一事件-连同BNFL在2001年提交的经修订的商业案例(请参阅NEI,2001年2月,第12页)-政府决定需要进一步考虑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号