【24h】

Modularised MSR Upgrade

机译:模块化MSR升级

获取原文
获取原文并翻译 | 示例
           

摘要

When Duane Arnold BWR came on line in early 1974, it had an initial design rating of 565.7MWe, and was provided with two of the earliest Moisture Separator Reheater (MSR) vessels designed with two-stage reheaters. These consist of a two-pass HP reheater bundle taking throttle steam, and a separate two-pass LP reheater receiving extraction steam from an intermediate stage of the HP turbine. The HP. reheaters presented problems from the very outset in that their steam/condensate outlet mixture carried far too much excess steam. Several efforts were made to control this excess loss through the use of orifices. However, these efforts were ultimately unsuccessful, and a continuing power loss resulted.
机译:杜安·阿诺德(Duane Arnold)BWR在1974年初投入生产时,其初始设计额定值为565.7MWe,并且配备有两台最早设计为两级再热器的水分分离器再热器(MSR)。其中包括一个带节流阀蒸汽的两遍高压再热器束,以及一个从高压涡轮中间级接收抽汽的独立的两遍低压再热器。惠普。再热器从一开始就存在问题,因为它们的蒸汽/冷凝水出口混合物携带过多的过量蒸汽。为了通过使用孔口来控制这种过多的损失,已经做了一些努力。但是,这些努力最终都没有成功,并导致了持续的功率损耗。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号