【24h】

Research reactor removal

机译:研究堆的拆除

获取原文
获取原文并翻译 | 示例
       

摘要

Specific attention to the subject of research reactor decommissioning is necessary because of the unique aspects of research reactor facilities when compared to other nuclear facilities. Significant aspects of research reactors, which make decommissioning activities distinctly different from other nuclear facilities, include: the broad spectrum of research reactor types including prototype reactors; the range and specificity of experimental work carried out in research reactors; and the proximity of some research reactors to the public domain. In particular, attention to and planning for eventual decommissioning of research reactors has been generally poor in most countries while reactors were being designed, constructed, operated and shutdown. Plans for decommissioning were at best 'a rough conceptual plan' in most countries and proper infrastructure was either missing or inadequate. This included the lack of decommissioning-oriented regulations, record keeping, waste management and disposal sites, expertise, training, and technologies. All of these aspects did not receive proper planning attention with the inaccurate perception that decommissioning could be accomplished quite readily with minimal planning and available resources. Complacency in decommissioning planning and implementation has resulted in undue delays, lack of funding availability and other resources, and invariably results in extra costs.
机译:由于研究堆设施与其他核设施相比具有独特的方面,因此有必要特别注意研究堆退役。研究堆的退役活动与其他核设施明显不同的重要方面包括:研究堆类型广泛,包括原型堆;在研究堆中进行的实验工作的范围和特异性;以及一些研究堆接近公共领域。特别是,在设计,建造,运行和关闭反应堆的大多数国家中,对研究堆最终退役的关注和计划普遍较差。在大多数国家,退役计划充其量只是“一个粗略的概念计划”,并且缺少适当的基础设施或设备不足。这包括缺乏以退役为导向的法规,记录保持,废物管理和处置场所,专业知识,培训和技术。所有这些方面都没有得到适当的计划关注,这是不正确的看法,即只需最少的计划和可用资源就可以很容易地完成退役。退役规划和执行的自满情绪导致了不适当的延误,缺乏可用的资金和其他资源,并必然导致额外的成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号