Kahl marks milestone

机译:卡尔标志着里程碑

获取原文
获取原文并翻译 | 示例
       

摘要

The Kahl Nuclear Power Test Plant (VAK) began operations as the first commercial nuclear power plant in the Federal Republic of Germany in 1960. In 1985, the 16MWe boiling water reactor was shut down - having produced 2.1TWh of electricity during 150,000 hours of operation. Dismantling and disposal of contaminated and radioactive systems and major components in the controlled area has been in progress since 1992. RWE Nukem took over dismantling and decommissioning operations including the transfer of personnel in 2001. The goal is the complete removal of the facility and the release of the site from nuclear regulatory control. Following the dismantling of the reactor pressure vessel, the remaining activity decreased to about 2x10~(11)Bq. In addition, the reactor pit and the concrete of the biological shield were now exposed.
机译:1960年,Kahl核试验厂(VAK)作为德意志联邦共和国的第一座商业核电站开始运行。1985年,关闭了16MWe沸水反应堆-在15万小时的运行时间内产生了2.1TWh的电力。自1992年以来,就一直在进行控制区内污染和放射性系统及主要部件的拆卸和处置。RWENukem于2001年接管了拆卸和退役作业,包括人员转移。目标是彻底撤离该设施并将其释放现场的核监管控制。拆除反应堆压力容器后,剩余活性降至约2x10〜(11)Bq。此外,现在暴露了反应堆坑和生物防护罩的混凝土。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号